The Central Interceptor project was a 14.5km long bored tunnel with two pipe jacked branches feeding into the main tunnel.
Microtunnelling Key Features
-
10 shafts from 4.5 to 10m dia, ranging from 12m to 85m deep
-
4.5m 85m deep shafts to be drilled and GRP lined
-
Secant piled / shotcrete for the remainder of the shafts
-
2.5km of 2400mm MTBM tunnel, maximum drive length 950m
-
1.5km of 2100mm MTBM tunnel.
-
Both tunnels to be done with an HK EPB microtunneling machine
​