Central Interceptor -Auckland

The Central Interceptor project was a 14.5km long bored tunnel with two pipe jacked branches feeding into the main tunnel.

Microtunnelling Key Features

  • 10 shafts from 4.5 to 10m dia, ranging from 12m to 85m deep

  • 4.5m 85m deep shafts to be drilled and GRP lined

  • Secant piled / shotcrete for the remainder of the shafts 

  • 2.5km of 2400mm MTBM tunnel, maximum drive length 950m

  • 1.5km of  2100mm MTBM tunnel.

  • Both tunnels to be done with an HK EPB microtunneling machine 

​

 